Tensioning a Highline

The full span is visible with the formula T=DL/4Y displayed at the top. The span is annotated at 50 metres anchor to anchor. A vertical orange arrow drops from the carriage level downward, annotated at 7 metres total. A dashed bracket alongside the load package shows 2 metres — the vertical depth occupied by the

Tensioning a Highline Read More »