Search Results for: two tension

Twin Highline Unit 6 : Twin Highline and Track Line Using a Manned Belay Part 2

  The second part of using a Twin Highline with a designated belayer to lower the worker or rescuer down to the working area. This segment goes through the first part of the process of using the Twin Highline Track Line with a belayer belaying the rescuer or worker as they move down the line. …

Twin Highline Unit 6 : Twin Highline and Track Line Using a Manned Belay Part 2 Read More »

Twin Highline Unit 7 : Twin Highline and Track Line Using a Self Belay Part 1

  Unit 7 goes through the Twin Highline process, but instead of having a designated belayer this version shows the worker using a self belay technique. This segment goes through the first part of the process of using the Twin Highline Track Line with a self belay as part of the progression in ascending or …

Twin Highline Unit 7 : Twin Highline and Track Line Using a Self Belay Part 1 Read More »

PART 3: Carriage System | TWIN BUNDLE | Horizontal Rigging

Carriage System The carriage system for a twin bundle or quad bundle highline is very similar to the single trackline. At this point of the discussion, We can now see how much tighter the trackline is. Each rope of the trackline is about the same tension as the single system…in this case we have two …

PART 3: Carriage System | TWIN BUNDLE | Horizontal Rigging Read More »